Steam, electricity and cooling-water checklist for evaporators

Prepare the utility data needed for steam, TVR or MVR falling film evaporation: pressures, electrical capacity, cooling conditions and operating hours.

01 / SELECTION

Describe the heating supply

Give available steam pressure, normal variation, quality and condensate-return conditions. Identify whether feed preheating is inside the evaporator scope. For TVR, the motive-steam basis is especially important because it affects the recompression operating point.

02 / SELECTION

Describe the electrical service

For an MVR option, state supply voltage and frequency, available power, motor and drive requirements and any start-up restrictions. Pumps, controls and auxiliaries also consume electricity. Ask for the normal and peak utility schedule rather than only one headline compressor figure.

03 / SELECTION

Describe heat rejection and vacuum services

Give cooling-water inlet temperature, allowable outlet temperature, available flow and seasonal variation. State whether a closed cooling circuit or another heat sink is proposed. Condensing capacity and non-condensable removal help establish the pressure profile; an unspecified vacuum figure is not a complete utility basis.

04 / SELECTION

Compare annual operation on the same basis

Provide production hours, batch or continuous schedule, expected minimum load and product-change frequency. Include start-up, shutdown and cleaning in the comparison. Utility economics should use site prices and an agreed heat balance rather than an unqualified percentage saving.

Related selection resources

YOUR PRODUCT. YOUR DUTY.

Give the equipment a clear brief.

Tell us the liquid, feed rate and concentration target. Add the utility conditions you know; we will identify what needs further review.

Discuss your evaporation duty